Do you have any question about this t-code?
Transaction Code: MD40
Description: MPS Planning Run
Release: S/4HANA and ECC 6
Menu Path:
Program: SAPMM61X
Screen: 110
Authorization Object:
Development Package: MD03
Package Description: Application Devt ERP MPS/Deterministic Requirements Planning
Parent Package: APPL
Module/Component: PP-MRP-BD
Description: Master Data
Overview: The SAP transaction code MD40 is used to run the Material Requirements Planning (MRP) planning run. This planning run is used to determine the material requirements for a given period of time. It takes into account the current stock levels, planned orders, and forecasted demand. The output of the planning run is a list of planned orders that can be used to replenish stock levels. Functionality: The MD40 transaction code is used to run the MRP planning run. This planning run takes into account the current stock levels, planned orders, and forecasted demand. The output of the planning run is a list of planned orders that can be used to replenish stock levels. The MRP planning run also takes into account any safety stock levels that have been set up in the system. Step-by-step How to Use: 1. Enter the transaction code MD40 in the command field. 2. Enter the material number for which you want to run the MRP planning run. 3. Select the “Planning Run” option from the menu bar. 4. Select the “Execute” button to start the MRP planning run. 5. The output of the MRP planning run will be displayed in a list format with details such as material number, quantity, and date of delivery for each planned order. 6. Select the “Save” button to save the output of the MRP planning run. 7. Select the “Back” button to return to the main menu screen. Other Recommendations: It is recommended that you review and analyze the output of the MRP planning run before taking any action on it. This will help ensure that you are making informed decisions about your material requirements and inventory levels. Additionally, it is important to keep in mind that any changes made to safety stock levels or forecasted demand will affect the output of the MRP planning run and should be taken into consideration when reviewing its results.
Get instant SAP help. Start your 7-day free trial now.
Feature | Free Access | Free Trial |
---|---|---|
Basic T-Code Explanation | ![]() |
![]() |
Step-by-Step Usage Guide | ![]() |
![]() |
Interactive SAP Coach Assistance | ![]() |
![]() |
AI Troubleshooting for T-Code Errors | ![]() |
![]() |