MD41 - MPS - Single-item, Multi-level -


SAP Transaction Code - Details

  • Transaction Code: MD41

    Description: MPS - Single-item, Multi-level -

    Release: S/4HANA and ECC 6

    Menu Path:

    • Logistics > Production > Production Planning > MPS > MPS > Single-Item, Multi-Level
    • Logistics > Production - Process > Production Planning > MPS > MPS > Single-Item, Multi-Level
  • Show technical details Hide technical details
    • Program: SAPMM61X

      Screen: 150

      Authorization Object:

    • Development Package: MD03

      Package Description: Application Devt ERP MPS/Deterministic Requirements Planning

      Parent Package: APPL

    • Module/Component: PP-MRP-BD

      Description: Master Data


Smart SAP Assistant

  • SAP Tcode: MD41 - MPS - Single-item, Multi-level -
     Create Planned Order
    
    Overview:
    The SAP transaction code MD41 is used to create a planned order for a single item in a multi-level environment. This transaction code is used to create a planned order for a single item in the material requirements planning (MRP) system. The planned order is created based on the material requirements planning data and the master production schedule (MPS). 
    
    Functionality: 
    The MD41 transaction code allows users to create a planned order for a single item in a multi-level environment. This transaction code is used to create a planned order based on the material requirements planning data and the master production schedule. The planned order is created with the necessary information such as quantity, start date, and finish date. The planned order can then be used to generate production orders or purchase orders. 
    
    Step-by-step How to Use: 
    1. Enter the transaction code MD41 in the command field. 
    2. Enter the material number of the item for which you want to create a planned order. 
    3. Enter the quantity of the item that you want to produce or purchase. 
    4. Enter the start date and finish date of the planned order. 
    5. Click “Save” to save your changes and create the planned order. 
    
    Other Recommendations: 
    It is recommended that users check the material requirements planning data before creating a planned order with MD41. This will ensure that all necessary information is entered correctly and that there are no discrepancies between the material requirements planning data and the master production schedule. Additionally, users should check that all necessary fields are filled out correctly before saving their changes and creating the planned order.
    Artificial intelligence solution provided by tomco.ai.
    Disclaimer
    • Do you have any question about this t-code?


      Upgrade now to chat with this t-code.

Instant HelpGet instant SAP help. Start your 7-day free trial now.


Feature Free Access Free Trial
Basic T-Code Explanation T-Code Explanation T-Code Explanation 2
Step-by-Step Usage Guide Step-by-Step Step-by-Step 2
Interactive SAP Coach Assistance Interactive SAP Interactive SAP 2
AI Troubleshooting for T-Code Errors AI Troubleshooting AI Troubleshooting 2

Related SAP Transaction Codes

Click the links below to see the following related SAP tcodes:
  • MD40 - MPS Planning Run...

  • MD27 - Display Planning Calendar...

  • MD42 - MPS - Single-item, Single-level -...

  • MD43 - MPS - Single-item, Interactive -...


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant