Transaction Code: S_NWC_37000010
Description: SAP has not provided a description for this transaction.
Release: S/4HANA and ECC 6
Program: SAPLS_CUS_IMG_ACTIVITY
Screen: 200
Authorization Object:
Development Package:
Package Description:
Parent Package:
Module/Component:
Description:
Overview: S_NWC_37000010 is a SAP transaction code used to access the NWC7 - Create/Change/Display Network (Project System) application. This application is used to create, change, and display networks in the Project System. Functionality: The NWC7 application allows users to create, change, and display networks in the Project System. It also allows users to assign activities to the network and to assign resources to the activities. The application also provides a graphical representation of the network, which can be used to analyze and optimize the network. Step-by-step How to Use: 1. Enter S_NWC_37000010 in the SAP command field. 2. Select the “Create” option from the menu bar. 3. Enter the required information for the network, such as name, description, and start date. 4. Select “Save” to save the network. 5. Select “Activities” from the menu bar to assign activities to the network. 6. Enter the required information for each activity, such as name, description, and duration. 7. Select “Save” to save the activities. 8. Select “Resources” from the menu bar to assign resources to each activity. 9. Enter the required information for each resource, such as name and quantity. 10. Select “Save” to save the resources. 11. Select “Display” from the menu bar to view a graphical representation of the network. 12. Select “Optimize” from the menu bar to optimize the network based on user-defined criteria. 13. Select “Save” to save any changes made during optimization. 14. Select “Print” from the menu bar to print a copy of the network for reference purposes. 15. Select “Exit” from the menu bar when finished with the application. Other Recommendations: It is recommended that users familiarize themselves with all of the features of NWC7 before using it for creating or modifying networks in Project System, as there are many options available that can be used for optimizing networks and assigning resources efficiently and effectively. Additionally, users should always save their work frequently while using NWC7 in order to avoid losing any changes made during optimization or other processes within NWC7 due to system errors or other unexpected events that may occur during use of this application
Sign up takes 1 minute. 7-day free trial.
S_NWC_37000009 - ...
S_NWC_37000008 - ...
S_NWC_37000011 - ...
S_NWC_37000012 - ...