MD03 - MRP-Individual Planning-Single Level


SAP Transaction Code - Details

  • Transaction Code: MD03

    Description: MRP-Individual Planning-Single Level

    Release: S/4HANA and ECC 6

    Menu Path:

    • Logistics > Materials Management > Material Requirements Planning (MRP) > MRP > Planning > Single-Item, Single-Level
    • Logistics > Production > MRP > Planning > Single-Level Single-Item Planning
    • Logistics > Production - Process > MRP > Planning > Single-Level Single-Item Planning
  • Show technical details Hide technical details
    • Program: SAPMM61X

      Screen: 200

      Authorization Object:

    • Development Package: MD

      Package Description: Application Development R/3 Material Requirements Planning

      Parent Package: APPL

    • Module/Component: PP-MRP-BD

      Description: Master Data


Smart SAP Assistant

  • SAP Tcode: MD03 - MRP-Individual Planning-Single Level
    
    Overview: 
    MD03 is a SAP transaction code used for MRP-Individual Planning-Single Level in the SAP system. It is used to plan material requirements for a single material or a group of materials. It is used to create a planning table for the material, which can be used to determine the quantity and timing of material requirements. 
    
    Functionality: 
    MD03 allows users to plan material requirements for a single material or a group of materials. It creates a planning table that can be used to determine the quantity and timing of material requirements. The planning table can be used to identify potential shortages or excesses in the supply chain, and to adjust production plans accordingly. 
    
    Step-by-step How to Use: 
    1. Enter the transaction code MD03 in the command field. 
    2. Enter the material number or group of materials you wish to plan for in the Material field. 
    3. Enter the plant number in the Plant field. 
    4. Enter the date range you wish to plan for in the Date Range field. 
    5. Click Execute (F8). 
    6. The planning table will be displayed, showing the quantity and timing of material requirements for the specified period. 
    7. Adjust production plans accordingly, if necessary, based on potential shortages or excesses identified in the planning table. 
    
    Other Recommendations: 
    It is recommended that users familiarize themselves with all of the options available in MD03 before using it, as there are many settings that can be adjusted to customize the planning table according to individual needs. Additionally, users should ensure that all relevant data is up-to-date before running MD03, as this will ensure that accurate results are obtained from the planning table.
    Artificial intelligence solution provided by tomco.ai.
    Disclaimer
    • Do you have any question about this t-code?


      Upgrade now to chat with this t-code.

Instant HelpGet instant SAP help. Start your 7-day free trial now.


Feature Free Access Free Trial
Basic T-Code Explanation T-Code Explanation T-Code Explanation 2
Step-by-Step Usage Guide Step-by-Step Step-by-Step 2
Interactive SAP Coach Assistance Interactive SAP Interactive SAP 2
AI Troubleshooting for T-Code Errors AI Troubleshooting AI Troubleshooting 2

Related SAP Transaction Codes

Click the links below to see the following related SAP tcodes:
  • MD02 - MRP - Single-Item, Multi-Level...

  • MD01N - MRP Live...

  • MD04 - Display Stock/Requirements Situation...

  • MD04P - Stock/Requirements Pegging...


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant