Transaction Code: KKB3
Description: Costing Items for WBS Elements
Release: S/4HANA and ECC 6
Program: RKKBKIS1
Screen: 1000
Authorization Object:
Development Package: KKB
Package Description: Reporting for Costing
Parent Package: APPL
Module/Component: CO-PC-IS
Description: Product Cost Controlling Information System
Overview: The SAP transaction code KKB3 is used to view and maintain costing items for WBS elements. This transaction code is used to assign costs to WBS elements, which are then used to calculate the total cost of a project. Functionality: KKB3 allows users to view and maintain costing items for WBS elements. This includes assigning costs to WBS elements, such as labor costs, material costs, and overhead costs. The total cost of a project can then be calculated based on the assigned costs. Step-by-step How to Use: 1. Enter the transaction code KKB3 in the command field. 2. Select the WBS element you want to assign costs to. 3. Enter the cost item and amount for each cost item you want to assign. 4. Click “Save” when you are finished entering all of the cost items and amounts. 5. The total cost of the project will be calculated based on the assigned costs. Other Recommendations: It is important to ensure that all of the cost items and amounts are entered correctly in order for the total cost of the project to be accurately calculated. Additionally, it is recommended that users periodically review and update the assigned costs in order to ensure that they are up-to-date and accurate.
Sign up takes 1 minute. 7-day free trial.