Component: PM
Component Name: Plant Maintenance
Description: The linking of two or more technical objects through other technical objects. Only functional locations or pieces of equipment can be linked. &EXAMPLE& A link is created between two pumps by laying a water pipe between them. The pumps and the pipe are represented as pieces of equipment in the system.
Key Concepts: Link is a term used in SAP Plant Maintenance (PM) to refer to the relationship between two objects. It is used to connect two objects together, such as a functional location and an equipment, or a notification and an order. Links are used to store information about the relationship between the two objects, such as the start and end date of the relationship. How to use it: In SAP PM, links can be created by selecting the “Create Link” option from the menu. This will open a window where you can select the two objects that you want to link together. Once you have selected the two objects, you can enter any additional information about the relationship, such as start and end dates. Once you have entered all of the necessary information, you can save the link. Tips & Tricks: When creating links in SAP PM, it is important to make sure that all of the necessary information is entered correctly. This includes making sure that all of the dates are accurate and that any additional information is entered correctly. Additionally, it is important to make sure that all of the links are up-to-date and accurate. Related Information: For more information on links in SAP PM, please refer to the official SAP documentation on Plant Maintenance (PM). Additionally, there are many online resources available that provide detailed tutorials on how to create and manage links in SAP PM.
Sign up takes 1 minute. 7-day free trial.