Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 724
Message text: Para & & existe una reserva relevante para tesorería
You are attempting to change the allocation of a component to a WBS
element.
Note that a planned order or production order may have already been
generated in material requirements planning.
If only a planned order has been generated, you just have to carry out
a new planning run to adjust the requirements accordingly.
If a production order exists, the system will not delete it. Therefore,
you must process it manually.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
Sign up takes 1 minute. 7-day free trial.
CN723 El elemento PEP no está previsto para proyectos
¿Qué causa este problema? There is no project stock for the WBS element.Respu...
CN722 No puede crearse sol.ped. debido a falta de programación
¿Qué causa este problema? The system has attempted to create a purchase requi...
CN725 Introduzca el tipo de imputación para solicitud pedido/reserva
¿Qué causa este problema? You are attempting to externally obtain or internal...
CN726 La componente & & ya ha sido liberada
¿Qué causa este problema? You have attempted to change the account assignment...
Los mensajes de SAP se dividen en 3 categorías diferentes:
mensajes de error (tipo de mensaje = E), mensajes de advertencia
(W) o informativos (I).
Un mensaje de error le impedirá continuar con su trabajo: es una parada difícil y debe corregir el error antes de poder continuar. Un mensaje de advertencia detendrá su trabajo, sin embargo, puede omitir la advertencia presionando la tecla Intro en su teclado. Dicho esto, sigue siendo una buena práctica investigar la causa del mensaje de advertencia y solucionarlo. Un mensaje de información no detendrá su trabajo y es realmente solo para fines informativos.
Haga clic en este enlace para buscar todos los mensajes de SAP.