/SCMTMS/PLN_OPT_EXP602 - Acceptable date is outside the planning horizon

Start a new search

SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SCMTMS/PLN_OPT_EXP -

  • Message number: 602

  • Message text: Acceptable date is outside the planning horizon

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


AnswerBot

  • What is the cause and solution for SAP error message /SCMTMS/PLN_OPT_EXP602 - Acceptable date is outside the planning horizon ?

    The SAP error message /SCMTMS/PLN_OPT_EXP602 indicates that the acceptable date for a planning operation is outside the defined planning horizon. This typically occurs in the context of SAP Transportation Management (TM) when trying to plan or execute a transportation operation that falls outside the configured time frame for planning.

    Cause:

    1. Planning Horizon Configuration: The planning horizon in SAP TM is defined in the system settings. If the date you are trying to use for planning is beyond this horizon, the system will throw this error.
    2. Incorrect Date Input: The date you are trying to use for planning may have been incorrectly entered or calculated, leading it to fall outside the acceptable range.
    3. System Settings: The planning horizon may not be set correctly for the specific transportation planning scenario you are working with.

    Solution:

    1. Check Planning Horizon Settings:

      • Navigate to the configuration settings in SAP TM.
      • Check the planning horizon settings for the relevant transportation planning area. You can find this under the configuration for transportation management.
      • Adjust the planning horizon to include the date you are trying to use for planning.
    2. Adjust the Date:

      • If the date you are trying to use is not critical, consider adjusting it to fall within the defined planning horizon.
    3. Review Transportation Planning Parameters:

      • Ensure that the parameters for transportation planning are set correctly and that they align with your business requirements.
    4. Consult Documentation:

      • Review SAP documentation or help resources for more detailed information on configuring planning horizons and related settings.
    5. Contact SAP Support:

      • If you are unable to resolve the issue through configuration changes, consider reaching out to SAP support for assistance.

    Related Information:

    • Planning Horizon: This is a critical configuration in SAP TM that defines the time frame within which planning activities can occur. It is essential for ensuring that transportation operations are planned effectively and within the expected time frames.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance on configuring planning horizons.
    • Transaction Codes: Familiarize yourself with transaction codes related to transportation management, such as /SCMTMS/PLN for planning-related activities.

    By addressing the planning horizon settings and ensuring that the dates used for planning are within the acceptable range, you should be able to resolve the error message /SCMTMS/PLN_OPT_EXP602.

  • AnswerBot is an artificial intelligence solution provided by tomco.ai.
    Disclaimer

Sign up and try ERPlingo for free.

Sign up takes 1 minute. 7-day free trial.




Related SAP Error Messages

Click the links below to see the following related messages:


SAP messages fall into 3 different categories: Error messages (message type = E), Warnings (W) or Informational (I) messages.

An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.

Click on this link to search all SAP messages.