/SCMTMS/PLN_FUBR001 - Process controller strategy for FUB must not be initial

Start a new search

SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SCMTMS/PLN_FUBR -

  • Message number: 001

  • Message text: Process controller strategy for FUB must not be initial

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


AnswerBot

  • What is the cause and solution for SAP error message /SCMTMS/PLN_FUBR001 - Process controller strategy for FUB must not be initial ?

    The SAP error message /SCMTMS/PLN_FUBR001 Process controller strategy for FUB must not be initial typically occurs in the context of SAP Transportation Management (TM) when there is an issue with the configuration of the process controller strategy for Freight Unit Building (FUB). This error indicates that the system is expecting a defined strategy for the FUB process, but it is currently not set or is empty (initial).

    Cause:

    1. Missing Configuration: The process controller strategy for Freight Unit Building (FUB) has not been defined in the system.
    2. Incorrect Settings: The settings for the process controller strategy may have been incorrectly configured or deleted.
    3. Transport Layer Issues: If the system is newly set up or has undergone changes, the transport layer might not have been properly configured.

    Solution:

    To resolve this error, you need to ensure that a valid process controller strategy for FUB is defined in the system. Here are the steps to do this:

    1. Access the Configuration:

      • Go to the SAP Easy Access screen.
      • Navigate to the configuration for Transportation Management. This is usually found under SPRO -> SAP Reference IMG -> Logistics Execution -> Transportation -> Transportation Management -> Freight Unit Building.
    2. Define Process Controller Strategy:

      • Look for the section related to the process controller strategy for FUB.
      • Ensure that a valid strategy is defined. If it is missing, you will need to create a new one.
      • Make sure to assign the appropriate settings and parameters that align with your business processes.
    3. Check for Existing Strategies:

      • If there are existing strategies, verify that they are correctly configured and not set to initial or empty.
    4. Transport Requests:

      • If the system has recently undergone changes, ensure that all transport requests have been properly imported and that the configuration is consistent across the landscape (Development, Quality, Production).
    5. Testing:

      • After making the necessary changes, test the FUB process to ensure that the error no longer occurs.

    Related Information:

    • Documentation: Refer to the SAP Help Portal for detailed documentation on configuring Transportation Management and Freight Unit Building.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues or provide additional guidance related to this error.
    • Community Forums: Engage with the SAP Community or forums for insights from other users who may have encountered similar issues.

    By following these steps, you should be able to resolve the error and ensure that the process controller strategy for FUB is correctly configured in your SAP system.

  • AnswerBot is an artificial intelligence solution provided by tomco.ai.
    Disclaimer

Sign up and try ERPlingo for free.

Sign up takes 1 minute. 7-day free trial.




Related SAP Error Messages

Click the links below to see the following related messages:


SAP messages fall into 3 different categories: Error messages (message type = E), Warnings (W) or Informational (I) messages.

An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.

Click on this link to search all SAP messages.