/SCMTMS/PLN_FUB122 - Cannot split &1 &2 &3; conversion to planning quantity not possible

Start a new search

SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SCMTMS/PLN_FUB -

  • Message number: 122

  • Message text: Cannot split &1 &2 &3; conversion to planning quantity not possible

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


AnswerBot

  • What is the cause and solution for SAP error message /SCMTMS/PLN_FUB122 - Cannot split &1 &2 &3; conversion to planning quantity not possible ?

    The SAP error message /SCMTMS/PLN_FUB122 indicates that there is an issue with splitting a transportation requirement or planning element in the SAP Transportation Management (TM) module. The message states that the conversion to planning quantity is not possible, which typically means that the system cannot determine how to split the specified quantity into the required planning quantities.

    Causes:

    1. Incompatible Quantities: The quantities involved may not be compatible for splitting. For example, if the total quantity is not divisible by the required split quantity, the system will not be able to perform the operation.
    2. Configuration Issues: There may be configuration settings in the SAP TM that prevent the splitting of transportation requirements or planning elements.
    3. Missing Master Data: Required master data (like transportation lanes, shipping points, or product data) may be incomplete or incorrectly maintained.
    4. Business Rules: Certain business rules or constraints may be preventing the split from occurring, such as restrictions on minimum or maximum quantities.
    5. Status of the Object: The object (e.g., transportation requirement) may be in a status that does not allow for splitting.

    Solutions:

    1. Check Quantities: Verify the quantities involved in the operation. Ensure that the total quantity can be evenly split into the required planning quantities.
    2. Review Configuration: Check the configuration settings in SAP TM related to transportation planning and splitting. Ensure that they are set up correctly to allow for the desired operations.
    3. Validate Master Data: Ensure that all relevant master data is complete and correctly maintained. This includes checking transportation lanes, shipping points, and product data.
    4. Examine Business Rules: Review any business rules that may be in place regarding the splitting of transportation requirements. Adjust them if necessary to allow for the desired operation.
    5. Check Object Status: Ensure that the transportation requirement or planning element is in a status that allows for splitting. If it is not, you may need to change its status or create a new requirement.

    Related Information:

    • Transaction Codes: You may want to use transaction codes like /SCMTMS/PLN to access the planning area or /SCMTMS/TRA for transportation requirements to investigate further.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error message or provide additional guidance.
    • Documentation: Refer to the SAP Help Portal for detailed documentation on transportation management and planning processes.
    • Support: If the issue persists, consider reaching out to SAP support or your internal SAP team for further assistance.

    By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.

  • AnswerBot is an artificial intelligence solution provided by tomco.ai.
    Disclaimer

Sign up and try ERPlingo for free.

Sign up takes 1 minute. 7-day free trial.




Related SAP Error Messages

Click the links below to see the following related messages:


SAP messages fall into 3 different categories: Error messages (message type = E), Warnings (W) or Informational (I) messages.

An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.

Click on this link to search all SAP messages.