/SCMTMS/PLN_DLV109 - Linked to &1 &2, schedule line &3 &4

Start a new search

SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SCMTMS/PLN_DLV -

  • Message number: 109

  • Message text: Linked to &1 &2, schedule line &3 &4

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


AnswerBot

  • What is the cause and solution for SAP error message /SCMTMS/PLN_DLV109 - Linked to &1 &2, schedule line &3 &4 ?

    The SAP error message /SCMTMS/PLN_DLV109 typically relates to issues in the Transportation Management (TM) module, specifically concerning delivery scheduling and planning. The message indicates that there is a problem with the linked delivery or schedule line.

    Cause:

    The error message /SCMTMS/PLN_DLV109 can be triggered by several factors, including:

    1. Missing or Incorrect Data: The delivery or schedule line may not have the necessary data or may contain incorrect information.
    2. Inconsistent Status: The status of the delivery or schedule line may not be consistent with the expected status for processing.
    3. Configuration Issues: There may be configuration issues in the TM settings that affect how deliveries and schedule lines are processed.
    4. Master Data Issues: Problems with master data (e.g., material master, customer master) can lead to this error if the data is incomplete or incorrect.
    5. Transportation Planning Issues: If the transportation planning process has not been completed correctly, it can lead to this error.

    Solution:

    To resolve the error /SCMTMS/PLN_DLV109, you can take the following steps:

    1. Check Delivery and Schedule Line Data: Verify that the delivery and schedule line referenced in the error message have all the required data and that it is correct.
    2. Review Status: Ensure that the status of the delivery and schedule line is appropriate for the action you are trying to perform.
    3. Examine Configuration: Check the configuration settings in the Transportation Management module to ensure they are set up correctly.
    4. Validate Master Data: Review the relevant master data (material, customer, etc.) to ensure it is complete and accurate.
    5. Reprocess Transportation Planning: If applicable, reprocess the transportation planning to ensure that all steps have been completed correctly.
    6. Consult Logs: Check the application logs for more detailed error messages or warnings that can provide additional context for the issue.

    Related Information:

    • Transaction Codes: You may want to use transaction codes like /SCMTMS/PLN for planning or /SCMTMS/DEL for delivery processing to investigate further.
    • SAP Notes: Look for relevant SAP Notes that may address this specific error or provide patches or updates.
    • Documentation: Review the SAP Help Portal for documentation related to Transportation Management and delivery processing.
    • Support: If the issue persists, consider reaching out to SAP support or your internal SAP team for further assistance.

    By following these steps, you should be able to identify and resolve the underlying cause of the error message /SCMTMS/PLN_DLV109.

  • AnswerBot is an artificial intelligence solution provided by tomco.ai.
    Disclaimer

Sign up and try ERPlingo for free.

Sign up takes 1 minute. 7-day free trial.




Related SAP Error Messages

Click the links below to see the following related messages:


SAP messages fall into 3 different categories: Error messages (message type = E), Warnings (W) or Informational (I) messages.

An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.

Click on this link to search all SAP messages.