Message type: E = Error
Message class: /SCMTMS/PLN_DLV -
Message number: 006
Message text: Result: &1 delivery proposals have been created
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message
/SCMTMS/PLN_DLV006
indicates that a certain number of delivery proposals have been created during the planning process in the SAP Transportation Management (TM) module. The message typically appears as a notification rather than an error, informing the user that the planning process has generated delivery proposals based on the input data.Cause:
- Planning Process: The message is triggered during the planning run when the system evaluates transportation requirements and generates delivery proposals based on the available data (e.g., sales orders, stock levels, etc.).
- Configuration Settings: The number of delivery proposals created can depend on various configuration settings in the TM module, such as transportation lanes, routes, and planning strategies.
- Data Input: The input data provided for the planning run (e.g., transportation requirements, delivery dates, etc.) can influence the number of proposals generated.
Solution:
- Review Delivery Proposals: Check the generated delivery proposals to ensure they meet your requirements. You can do this in the SAP TM interface where you can view and manage delivery proposals.
- Adjust Planning Parameters: If the number of proposals is too high or not aligned with expectations, consider adjusting the planning parameters or settings in the TM configuration. This may include:
- Modifying transportation lanes or routes.
- Changing planning strategies or heuristics.
- Reviewing the input data for accuracy.
- Monitor and Analyze: Use reporting tools within SAP TM to analyze the delivery proposals and understand the underlying reasons for their creation. This can help in fine-tuning the planning process.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the planning process and how to manage delivery proposals effectively.
Related Information:
/SCMTMS/PLN
for planning and /SCMTMS/DEL
for delivery management./SCMTMS/PLN_DLV006
message for updates or known issues.If you continue to experience issues or have specific requirements, consider reaching out to your SAP support team or consulting with an SAP TM expert for tailored assistance.
Sign up takes 1 minute. 7-day free trial.
/SCMTMS/PLN_DLV005 &1 freight units have been processed during delivery proposal creation
Self-Explanatory Message Since SAP believes that this specific error message is ...
/SCMTMS/PLN_DLV004 FU &1 is blocked; removed from scope of delivery proposal
Self-Explanatory Message Since SAP believes that this specific error message is ...
/SCMTMS/PLN_DLV007 FU &1 removed from scope; schedule line sequence or quantity incorrect
What causes this issue? The freight unit has been excluded from delivery propos...
/SCMTMS/PLN_DLV008 &1 FUs are unsuitable for delivery proposal; removed from scope
Self-Explanatory Message Since SAP believes that this specific error message is ...
SAP messages fall into 3 different categories: Error messages
(message type = E), Warnings (W) or Informational (I) messages.
An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.
Click on this link to search all SAP messages.