Message type: E = Error
Message class: S1 - Statistik / SAP-Monitor
Message number: 428
Message text: New action added
You scheduled a new planning.
The planning entry is shown in the calendar and a batch processing job
is created. The name of this batch is built as follows:
DBA:<action shortname>@<time>/<day><period> where
<action name> = name of action as shown in the calendar
<time> = scheduled start time (without seconds)
<day> = number of day within the week (monday=1,...,sunday=7)
<period> = number of weeks between the executions (3 digits)
Wait until it should be executed and don't forget to look at the
results afterwards.
Error message extract from SAP system. Copyright SAP SE.
S1427 Add action canceled
What causes this issue? You pressed the cancel button either by accident or you...
S1426 Internal error: unknown action
What causes this issue? The system detected a planning with an action for which...
S1429 Nothing changed
What causes this issue? You entered the dialog for changing a scheduled action ...
S1430 Change action canceled
What causes this issue? You pressed a cancel button within the changing dialog....
SAP messages fall into 3 different categories: Error messages
(message type = E), Warnings (W) or Informational (I) messages.
An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.
Click on this link to search all SAP messages.