Do you have any question about this error?
Message type: E = Error
Message class: M3 - Material Master
Message number: 584
Message text: Planning material/plant is itself planned via & &
A planning material has already been assigned to the combination of
planning material and planning plant that you have entered. The
material concerned is &V1& in plant &V2&. The system allows only
single-level planning.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message M3584 indicates that there is a circular planning issue in the system. Specifically, it means that the material/plant combination you are trying to plan is itself being planned through another planning process, which creates a loop or circular reference. This can occur in various planning scenarios, such as Material Requirements Planning (MRP) or Production Planning (PP).
Cause:
- Circular Dependency: The material is set up in such a way that it is dependent on itself for planning, either directly or indirectly.
- Planning Hierarchy: The planning hierarchy may have been incorrectly configured, leading to a situation where a material is trying to plan itself.
- Master Data Issues: Incorrect settings in the material master data, such as planning parameters or dependencies, can lead to this error.
- Planning Strategies: Certain planning strategies may inadvertently create circular dependencies.
Solution:
- Check Material Master Data: Review the material master data for the affected material. Look for any planning parameters that may be causing the circular reference.
- Review Planning Settings: Check the planning settings in the configuration for MRP or PP. Ensure that the planning hierarchy is correctly set up and that there are no circular dependencies.
- Analyze Dependencies: Use transaction codes like MD04 (Stock/Requirements List) to analyze the dependencies and see how the material is being planned.
- Adjust Planning Parameters: If the material is set to be planned in a way that causes it to depend on itself, consider changing the planning parameters or strategy.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the planning strategy being used and how to resolve circular dependencies.
Related Information:
By addressing the root cause of the circular dependency and adjusting the relevant settings, you should be able to resolve the M3584 error and proceed with your planning activities.
Get instant SAP help. Start your 7-day free trial now.
Feature | Free Access | Free Trial |
---|---|---|
Basic SAP error explanation | ![]() |
![]() |
Step-by-Step Usage Guide | ![]() |
![]() |
Interactive SAP Coach Assistance | ![]() |
![]() |
AI Troubleshooting for T-Code Errors | ![]() |
![]() |
M3583 Enter a planning plant
What causes this issue? You have entered a planning material but no planning pl...
M3582 Enter a planning material or reset the planning plant/conversion factor
What causes this issue? You have entered a planning plant and/or a conversion f...
M3585 Not possible to plan this material since it is a planning material
What causes this issue? The material in this plant is already being used as a p...
M3586 System error in blocking the planning material
What causes this issue? A serious system error has occurred.How to fix this err...
SAP messages fall into 3 different categories: Error messages
(message type = E), Warnings (W) or Informational (I) messages.
An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.
Click on this link to search all SAP messages.