Message type: E = Error
Message class: /INCMD/MSG -
Message number: 210
Message text: Group &1 is already included in PSP &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message
/INCMD/MSG210 Group &1 is already included in PSP &2
typically occurs in the context of project system (PS) functionality, particularly when dealing with project structures and work breakdown structures (WBS). This error indicates that the specified group (e.g., a group of activities or tasks) is already included in the specified project structure (PSP - Project Structure Plan).Cause:
The error is caused by an attempt to include a group that has already been added to the project structure. This can happen due to:
To resolve this error, you can take the following steps:
Check Existing Groups: Review the current groups included in the project structure (PSP) to confirm that the group in question is indeed already included. You can do this by navigating to the project structure in the SAP GUI and checking the details.
Remove Duplicate Entries: If you find that the group is already included, you can either:
Modify the Group: If you need to make changes to the group, consider modifying the existing entry instead of trying to add it again.
Consult Documentation: If you are unsure about the project structure or how to manage groups, refer to SAP documentation or user manuals related to project management in SAP.
Seek Help from SAP Support: If the issue persists or if you believe it is a system error, consider reaching out to your SAP support team or consulting SAP Notes for any known issues related to this error message.
CJ20N
(Project Builder) or CJ02
(Change Project) to manage project structures effectively.By following these steps, you should be able to resolve the error and manage your project structure effectively.
/INCMD/MSG209 Only one default can be set for an inc.type-rep.type combination
Self-Explanatory Message Since SAP believes that this specific error message is ...
/INCMD/MSG208 Enter at least one default replacement type for an inc.type
Self-Explanatory Message Since SAP believes that this specific error message is ...
/INCMD/MSG211 Interchangeability group &1 does not exist
What causes this issue? The interchangeability group that you tried to search f...
/INCMD/MSG212 Cannot delete chain &1 as it is part of inc. group &2
What causes this issue? You tried to delete a supersession chain which is alrea...
SAP messages fall into 3 different categories: Error messages
(message type = E), Warnings (W) or Informational (I) messages.
An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.
Click on this link to search all SAP messages.