Message type: E = Error
Message class: /CWM/PP -
Message number: 005
Message text: Materials with PME can only be split in the detail view
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message
/CWM/PP005 Materials with PME can only be split in the detail view
typically occurs in the context of the SAP Advanced Planning and Optimization (APO) module, particularly when dealing with planning scenarios that involve materials with a Product Master Extension (PME).Cause:
This error message indicates that the system is preventing the user from splitting materials in the overview view when they have PME associated with them. PME is a feature that allows for more detailed planning and management of materials, and the system enforces certain restrictions to ensure data integrity and proper planning processes.
Solution:
To resolve this error, you need to switch to the detail view of the planning screen where you can perform the split operation. Here are the steps you can follow:
Navigate to the Detail View: Instead of trying to split the materials in the overview view, look for an option to switch to the detail view. This is usually done by selecting the material and then choosing an option like "Detail View" or "Edit".
Perform the Split: Once you are in the detail view, you should be able to split the materials as needed without encountering the error.
Check User Permissions: Ensure that you have the necessary permissions to perform the split operation in the detail view. If you do not have the required permissions, contact your SAP administrator.
Review Material Settings: If the issue persists, review the settings of the materials involved. Ensure that they are correctly configured for PME and that there are no other restrictions in place.
Related Information:
By following these steps, you should be able to resolve the error and successfully split the materials as needed.
/CWM/PP004 Items for CW-carried materials still exist without a quantity
What causes this issue? You want to save the confirmation/picking from the good...
/CWM/PP003 Entry quanity was changed. Adjust the parallel entry quantity
Self-Explanatory Message Since SAP believes that this specific error message is ...
/CWM/PP020 *** CWM messages in order ***
Self-Explanatory Message Since SAP believes that this specific error message is ...
/CWM/PP021 Not possible to create order for non-valuated sales order stock
What causes this issue? You cannot create and process orders for unvaluated sal...
SAP messages fall into 3 different categories: Error messages
(message type = E), Warnings (W) or Informational (I) messages.
An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.
Click on this link to search all SAP messages.