/CUM/CONMS027 - Construction measure & has status & and cannot be allocated to design

Start a new search

SAP Error Message - Details

  • Message type: E = Error

  • Message class: /CUM/CONMS -

  • Message number: 027

  • Message text: Construction measure & has status & and cannot be allocated to design

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


AnswerBot

  • What is the cause and solution for SAP error message /CUM/CONMS027 - Construction measure & has status & and cannot be allocated to design ?

    The SAP error message /CUM/CONMS027 typically indicates that a construction measure (or a project-related measure) has a specific status that prevents it from being allocated to a design. This error is often encountered in the context of project management or construction management modules within SAP, particularly in the context of the Construction Management (CUM) component.

    Cause:

    The error message can arise due to several reasons, including:

    1. Status Restrictions: The construction measure may be in a status that does not allow it to be allocated to a design. For example, it could be in a "locked" or "completed" status.
    2. Missing Dependencies: There may be missing prerequisites or dependencies that need to be fulfilled before the allocation can occur.
    3. Configuration Issues: There could be configuration settings in the system that restrict the allocation of certain measures based on their status.
    4. Authorization Issues: The user may not have the necessary permissions to allocate the construction measure to the design.

    Solution:

    To resolve the error, you can take the following steps:

    1. Check the Status: Review the status of the construction measure. If it is in a status that does not allow allocation (e.g., "Completed", "Locked"), you may need to change its status to one that permits allocation.
    2. Update the Measure: If the measure needs to be updated or modified, make the necessary changes and ensure that all required fields are filled out correctly.
    3. Review Dependencies: Ensure that all prerequisites for the allocation are met. This may involve checking related measures or project components.
    4. Consult Configuration: If you have access, check the configuration settings in the SAP system to see if there are any restrictions in place regarding the allocation of construction measures.
    5. Check Authorizations: Ensure that you have the necessary permissions to perform the allocation. If not, contact your system administrator to obtain the required access.
    6. Consult Documentation: Refer to SAP documentation or help resources for specific guidance related to the error message and the context in which it occurs.

    Related Information:

    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message. SAP frequently updates its knowledge base with solutions to common problems.
    • Transaction Codes: Familiarize yourself with relevant transaction codes that may help you navigate the project management or construction management modules (e.g., CJ20N for project management).
    • User Forums: Consider visiting SAP community forums or user groups where similar issues may have been discussed, and solutions shared.

    If the issue persists after following these steps, it may be beneficial to engage with your SAP support team or a consultant who specializes in SAP project management to further investigate the problem.

  • AnswerBot is an artificial intelligence solution provided by tomco.ai.
    Disclaimer

Related SAP Error Messages

Click the links below to see the following related messages:


SAP messages fall into 3 different categories: Error messages (message type = E), Warnings (W) or Informational (I) messages.

An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.

Click on this link to search all SAP messages.