CP341 - Reference sequence for parallel sequence cannot be a parallel sequence


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CP - Task list messages: Core data

  • Message number: 341

  • Message text: Reference sequence for parallel sequence cannot be a parallel sequence

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CP341 - Reference sequence for parallel sequence cannot be a parallel sequence ?

    The SAP error message CP341, which states "Reference sequence for parallel sequence cannot be a parallel sequence," typically occurs in the context of SAP's Production Planning (PP) or Advanced Planning and Optimization (APO) modules. This error is related to the configuration of sequences in production planning, particularly when dealing with parallel sequences.

    Cause:

    The error arises when you attempt to define a parallel sequence that references another parallel sequence. In SAP, a parallel sequence is designed to execute multiple operations simultaneously, and it cannot reference another parallel sequence as its predecessor. This is because the system expects a linear sequence of operations rather than a parallel one, which can lead to ambiguity in scheduling and resource allocation.

    Solution:

    To resolve this error, you can take the following steps:

    1. Review Sequence Configuration: Check the configuration of the sequences involved. Ensure that the sequence you are trying to reference is not a parallel sequence. If it is, you will need to change it to a linear sequence or adjust your planning logic.

    2. Modify the Reference: If you need to maintain a parallel structure, consider restructuring your sequences. You may need to create a new linear sequence that can serve as a reference for your parallel sequence.

    3. Check Dependencies: Ensure that the dependencies between operations are correctly defined. If a parallel sequence is necessary, ensure that it does not reference another parallel sequence directly.

    4. Consult Documentation: Refer to SAP documentation or help resources for guidance on configuring sequences in your specific version of SAP. This can provide insights into best practices and configuration options.

    5. Testing: After making changes, test the configuration in a development or test environment to ensure that the error is resolved and that the production planning process works as intended.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional context on sequence configurations.
    • SAP Community: Engage with the SAP Community forums to see if other users have encountered similar issues and what solutions they have implemented.
    • Training and Documentation: Consider training sessions or documentation on SAP PP/APO to better understand sequence configurations and best practices.

    By following these steps, you should be able to resolve the CP341 error and ensure that your production planning sequences are correctly configured.

    Artificial intelligence solution provided by tomco.ai.
    Disclaimer
    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Feature Free Access Free Trial
Basic SAP error explanation T-Code Explanation T-Code Explanation 2
Step-by-Step Usage Guide Step-by-Step Step-by-Step 2
Interactive SAP Coach Assistance Interactive SAP Interactive SAP 2
AI Troubleshooting for T-Code Errors AI Troubleshooting AI Troubleshooting 2

Related SAP Error Messages

Click the links below to see the following related messages:


SAP messages fall into 3 different categories: Error messages (message type = E), Warnings (W) or Informational (I) messages.

An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker