Do you have any question about this error?
Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 211
Message text: Change number & exceeds PRT to this operation (change number &)
During the date shift, a PRT assignment, shifted with the change number
&V1&, exceeds an existing change status with the change number &V2&.
The date shift is allowed or not according to the Customizing setting.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message CP211 indicates that a change number exceeds the allowed number of Production Resources/Tools (PRT) assigned to a specific operation in a production order or process order. This typically occurs in the context of production planning and control, where change numbers are used to manage modifications to production processes.
Cause:
- Exceeding Limit: The error arises when the number of PRTs assigned to an operation exceeds the system-defined limit for that operation.
- Configuration Settings: The configuration settings in the system may restrict the number of PRTs that can be assigned to a single operation.
- Change Management: The change number being referenced may have been incorrectly set up or may not align with the current configuration of the operation.
Solution:
- Review PRT Assignment: Check the PRTs assigned to the operation in question. Ensure that the total number of PRTs does not exceed the allowed limit.
- Adjust Configuration: If necessary, adjust the configuration settings in the system to allow for more PRTs to be assigned to the operation. This may involve changing parameters in the production planning settings.
- Modify Change Number: If the change number is not required, consider removing it or modifying it to ensure it aligns with the current operation's requirements.
- Consult Documentation: Refer to SAP documentation or help resources for specific details on the limits and configurations related to PRTs and change numbers.
- Contact SAP Support: If the issue persists, consider reaching out to SAP support for assistance, especially if it involves complex configurations or customizations.
Related Information:
By following these steps, you should be able to resolve the CP211 error and ensure that your production processes run smoothly.
Get instant SAP help. Start your 7-day free trial now.
Feature | Free Access | Free Trial |
---|---|---|
Basic SAP error explanation | ![]() |
![]() |
Step-by-Step Usage Guide | ![]() |
![]() |
Interactive SAP Coach Assistance | ![]() |
![]() |
AI Troubleshooting for T-Code Errors | ![]() |
![]() |
CP210 Change number & collsion with PRT to this operation (Change number &)
What causes this issue? During the date shift, a PRT assignment which is shifte...
CP209 Change number & exceeds existing change status (Number&)
What causes this issue? During the date shift, a change status, shifted with th...
CP212 Group counter already exists for the reference operation set
Self-Explanatory Message Since SAP believes that this specific error message is ...
CP213 Group counter already exists for the rate routing
Self-Explanatory Message Since SAP believes that this specific error message is ...
SAP messages fall into 3 different categories: Error messages
(message type = E), Warnings (W) or Informational (I) messages.
An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.
Click on this link to search all SAP messages.