Message type: E = Error
Message class: CL_CRM_PS_4S - Messages for Social Service
Message number: 035
Message text: Error during item period check
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
An error occured during checking of the Social Services Plan Item
periods because it was not possible to read the appointments of the
Item.
Check the cutomizing or contact your system administrator.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message CL_CRM_PS_4S035 typically indicates that there is an issue during the item period check in the context of CRM (Customer Relationship Management) and project system (PS) functionalities. This error can occur in various scenarios, such as when trying to create or modify a project, sales order, or service order.
Cause:
The error usually arises due to one or more of the following reasons:
- Invalid Dates: The start or end dates of the item may not fall within the allowed periods defined in the system.
- Period Locking: The period for the item might be locked for posting, which prevents any changes or postings from being made.
- Configuration Issues: There may be configuration settings in the project system or CRM that are not aligned with the item’s dates.
- Missing Master Data: Required master data (like project definitions, WBS elements, etc.) may be missing or incorrectly set up.
Solution:
To resolve the error, you can take the following steps:
- Check Dates: Verify the start and end dates of the item. Ensure they are within the allowed posting periods in the system.
- Review Period Locking: Check if the period is locked for posting. You can do this by navigating to the relevant transaction (e.g., transaction code OB52 for controlling periods) and ensuring that the period is open for the relevant company code and fiscal year.
- Configuration Review: Review the configuration settings in the project system and CRM to ensure they are correctly set up. This may involve checking the project profile settings and ensuring they align with the item’s requirements.
- Master Data Check: Ensure that all necessary master data is available and correctly configured. This includes checking project definitions, WBS elements, and any other related data.
- Consult Documentation: Refer to SAP documentation or notes related to this specific error message for additional insights or patches that may address the issue.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who can provide deeper insights into the specific configuration and data setup in your system.
CL_CRM_PS_4S032 Benefit ID not compatible with the SSP type
Self-Explanatory Message Since SAP believes that this specific error message is ...
CL_CRM_PS_4S031 Enter a benefit ID
Self-Explanatory Message Since SAP believes that this specific error message is ...
CL_CRM_PS_4S040 Social deduction plan &1 has already been approved
What causes this issue? You tried to approve the document version of a social d...
CL_CRM_PS_4S041 Enter payment family for item &1
Self-Explanatory Message Since SAP believes that this specific error message is ...
SAP messages fall into 3 different categories: Error messages
(message type = E), Warnings (W) or Informational (I) messages.
An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.
Click on this link to search all SAP messages.