Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 020
Message text: WBS element & already exists
There is an existing WBS element with "&V1&" in this operative project
or simulation version.
INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TX
Define another identifier for the WBS element.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message CJ020 indicates that a Work Breakdown Structure (WBS) element you are trying to create already exists in the system. This error typically occurs when you attempt to create a new WBS element with an identifier that is already in use.
Cause:
- Duplicate WBS Element: The most common cause is that the WBS element you are trying to create has the same identifier as an existing WBS element in the system.
- Incorrect Input: There may be a typographical error in the WBS element identifier you are trying to create.
- System Configuration: In some cases, the system configuration may allow for certain types of duplicates, but the specific project structure does not.
Solution:
Check Existing WBS Elements: Before creating a new WBS element, check the existing WBS elements to ensure that the identifier you want to use is not already in use. You can do this by navigating to the WBS element overview in SAP.
Use a Different Identifier: If the WBS element already exists, consider using a different identifier that is unique within the project structure.
Review Project Structure: Ensure that you are creating the WBS element in the correct project structure. Sometimes, the same identifier may be valid in different projects.
Transaction Codes: Use transaction codes like CJ20N (Project Builder) or CJ03 (Display WBS Element) to view and manage WBS elements.
Consult Documentation: If you are unsure about the naming conventions or the structure of WBS elements in your organization, consult your internal documentation or reach out to your SAP administrator.
Related Information:
By following these steps, you should be able to resolve the CJ020 error and successfully create or manage WBS elements in SAP.
Get instant SAP help. Start your 7-day free trial now.
Feature | Free Access | Free Trial |
---|---|---|
Basic SAP error explanation | ![]() |
![]() |
Step-by-Step Usage Guide | ![]() |
![]() |
Interactive SAP Coach Assistance | ![]() |
![]() |
AI Troubleshooting for T-Code Errors | ![]() |
![]() |
CJ019 Object does not exist
Self-Explanatory Message Since SAP believes that this specific error message is ...
CJ018 Cannot search in the selected column
What causes this issue? It is not possible to search for this object. You can s...
CJ021 WBS element & does not exist
What causes this issue? WBS element &V1& does not exist. The system iss...
CJ022 There are active simulations for the project
What causes this issue? You want to change an operative project. There are acti...
SAP messages fall into 3 different categories: Error messages
(message type = E), Warnings (W) or Informational (I) messages.
An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.
Click on this link to search all SAP messages.