Message type: E = Error
Message class: /ACCGO/CCK_TOLERANCE -
Message number: 126
Message text: You cannot transfer schedule &1 as it is in 'Draft' status
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message
/ACCGO/CCK_TOLERANCE126
indicates that you are trying to transfer a schedule that is currently in 'Draft' status. This error typically occurs in the context of the SAP Controlling (CO) module, particularly when dealing with cost center accounting or internal orders.Cause:
The primary cause of this error is that the schedule you are attempting to transfer has not been finalized or approved. In SAP, documents or schedules in 'Draft' status are not yet complete and cannot be processed further until they are released or saved in a finalized state.
Solution:
To resolve this error, you need to take the following steps:
Check the Status of the Schedule:
- Navigate to the relevant transaction or report where the schedule is located.
- Verify that the schedule is indeed in 'Draft' status.
Finalize the Schedule:
- If you have the necessary permissions, you can finalize the schedule by saving it or changing its status from 'Draft' to 'Active' or 'Released'.
- Look for options like "Release", "Save", or "Complete" in the transaction you are using.
Consult with Your Team:
- If you do not have the necessary permissions to change the status, consult with your team lead or the person responsible for managing schedules in your organization. They may need to approve or finalize the schedule.
Retry the Transfer:
- Once the schedule is in an appropriate status (not 'Draft'), attempt the transfer again.
Related Information:
By following these steps, you should be able to resolve the error and successfully transfer the schedule.
/ACCGO/CCK_TOLERANCE125 You cannot change retired schedule &1
Self-Explanatory Message Since SAP believes that this specific error message is ...
/ACCGO/CCK_TOLERANCE124 No data found for selection criteria
Self-Explanatory Message Since SAP believes that this specific error message is ...
/ACCGO/CCK_TOLERANCE127 Cannot transfer schedule &1; it is for marketing contracts
What causes this issue? You have selected tolerance schedules relevant for mark...
/ACCGO/CCK_TOLERANCE128 Tolerance schedule &1 is being saved in 'Draft' status
Self-Explanatory Message Since SAP believes that this specific error message is ...
SAP messages fall into 3 different categories: Error messages
(message type = E), Warnings (W) or Informational (I) messages.
An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.
Click on this link to search all SAP messages.